Instrument Maintenance 09/02/2014
Mimir Cooling Start
- Turned on BA Gauge
- Pegged the detector temperature to the current temperature, make sure to turn the heater on.
- Set the temperature set point for the second stage to 10.0K
- Changed the temper log file data to reflect the current date i.e. 20140902.tc.log in this case.
- Changed plottempa.pro to look at new temper file.
- Rebuilt the IDL virtual machine program to push the web pages.
- Moved the Camera, Slit, and Decker to home
- Started the runstage program to move the mechanisms while cooling.
- Started the compressor at 13:13 09/02/2014.
- Changed the Amperage for the BA gauge to 6.5 mA at 14:15.
- Fix the crontab so the BA gauge would automatically turn on and off.
- 16:09, started the detector to ramp at 0.1 K/m to 33.5K
- 16:36, Valved off the vacuum pumps
PRISM Maintenance
- Replaced the fans on the instrument mechanisms.
- Increased the tension on FW3 detent arm.(Thanks Dan!)