This list is provided for reference purposes.

Past Instrument Cube Configuration

2016Q1
2016Q2
2016Q3 (July; before primary re-aluminization)
2016Q4
2017Q1

LMI & DeVeny will be available to users the entire quarter. IGRINS will be available until ~28-Feb.

For January & February:

For March:

2017Q2
2017Q3

The top element of the corrector for the straight through port (where LMI is mounted) was replaced in July 2017. IGRINS installation is expected 24-31 August, with final recommissioning check out possibly extending into the first week of September. EXPRES is expected to start commissioning during 17Q3. NIHTS commissioning is TBD.

For July & August:

For September:

2017Q4

2018A

For January:

For February:

For March through June:

2018B

The LDT secondary mirror will be remounted during the July/August engineering shutdown period.

For July through mid-September:

For mid-September through December:

For 2019A:

For January through April:

For May through June:

For 2019B:

For July through December:

For 2020A:

For January through June:

For 2020B:

For July through December:

For 2021A:

For January through June: