The DCT name has changed to the Lowell Discovery Telescope (LDT).
This page gives a general overview for visitors and staff
...
(Please send us any comments or suggestions for ways to improve these pages.)
...
width | 50% |
---|
Updates (and Old Updates)
Expand | ||
---|---|---|
| ||
Ephemeris based pointing and tracking is not currently functional. The cause is understood and it will be fixed with the next release of the telescope control system. Until that happens, we recommend observers who need non-sidereal tracking prepare target lists that include both positions and offset tracking rates, and if the object(s) move quickly enough, consider multiple entries per night. JPL's Horizons and the MPC ephemeris service can provide the necessary rate information. (2020Jan02) |
UPDATE: The 2020A staffing schedule for January through March is up. All remote requests for that period are covered. (2019Dec26)
UPDATE: The 2020A schedule has been finalized and released. (2019Dec02)
UPDATE: Winter has set in. DCT has already seen its first large storm. Be prepared for winter conditions.(2019Dec02)
UPDATE: A correction to the correction. The DeVeny grating DV2 is actually blazed at 4000A, not 5000A. This was a long standing mistake here. The grating has been identified as a copy of KPNO #09, which is 300g/mm, 4000A blaze. (2019Sep18)
Expand | ||
---|---|---|
| ||
An updated version of the NIHTS User Manual (v1.4 - 2019013) has been released and is available on the DCT confluence pages. Per the authors, NIHTS User Manual v1.4 adds a description of blind target acquisition using LMI. |
Expand | ||
---|---|---|
| ||
We have looked into quantifying the delay between when a user requests an image with LMI, and when the shutter actually opens. Details can be found in the write up under the LMI link about the shutter delay. The bottom line is that:
Exposure times should be computed as:
|
Expand | ||
---|---|---|
| ||
The DeVeny Spectrograph Reference and Operations Guide has been updated for the new release of the slitviewing camera GUI application. Version v1.5 (10 July 2018) of the manual is now available on the Observing at DCT confluence page. |
Important Notes for all DCT Users and Visitor
DCTUsers Slack Channel for Discussion & Announcements
Proposing to Observe
Applying for Observing Time - 2020A DCT Call for Proposals
Observing Run Preparation
What to do before showing up for your run
First time using DCT, or a particular instrument?
Calendars:
...
As of 23 March 2021, these pages are no longer being maintained.
Please refer to the new LDTOI pages for current documentation.
Ephemeris Data Submission/Generation
Automated Function and Pattern Data Submission
Object Data and Finder Chart Generators
During Your Run
Target of Opportunity (ToO) Procedures
After Your Run
Data Retrieval
...
width | 50% |
---|
The Telescope
For an overview of the telescope and site, see
Information about the seeing and image quality:
- Levine, DeGroff 2016, SPIE, 9906, 990672 (delivered image quality)
- Bida et al. 2004, SPIE, 5489, 196 (site test data)
For an overview of the first generation Instruments, see
Instruments
DCT Instrumentation Current & Future
Expand | ||
---|---|---|
| ||
Operational.Web Page: Manual: DeVeny_Manual_v1.5_10July18.pdf Additional Information: DeVeny_Ops_Appendix.tar |
Expand | ||
---|---|---|
| ||
Operational - PI instrumentWeb Page: the instrument page at Gemini-N is mostly applicable and very informative Manual: Additional Information: DSSI is available part time at DCT. For information, contact E. Horch or G. van Belle. |
Expand | ||
---|---|---|
| ||
Commissioning now/limited science operationsWeb Page: EXPRES web page Manual: Additional Information: An overview of the instrument can be found in Jurgenson et al. 2016, Proc SPIE, 9908, 99086T |
Expand | ||
---|---|---|
| ||
On DCT through 30 April 2019Web Page: IGRINS wiki has a lot of information about IGRINS Manual: Additional Information: IGRINS will be available part of the year in 2016, 2017 and 2018. For information, contact L. Prato or G. Mace. |
Expand | ||
---|---|---|
| ||
Operational.Web Page: Manual: LMI User Manual Additional Information: LMI Exposure time calculator, LMI Filter Information, LMI shutter delay |
Expand | ||
---|---|---|
| ||
Operational, finishing commissioning.Web Page: Manual: NIHTS User Manual (v. 1.4 - 20190130) Additional Information: Overview of NIHTS (2018 Proc. SPIE 10702, 107023E) |
Expand | ||
---|---|---|
| ||
Coming soon.Web Page: Manual: Additional Information: |
Site Information
Where to stay when observing at DCT
General Information
Schedules for other Lowell telescopes
DCT Scientific and Technical Publications
DCT Selected Technical Publications (full PDF copies)
...