The DCT name has changed to the Lowell Discovery Telescope (LDT).
This page gives a general overview for visitors and staff
...
(Please send us any comments or suggestions for ways to improve these pages.)
...
width | 50% |
---|
Updates (and Old Updates)
Expand | ||
---|---|---|
| ||
We have looked into quantifying the delay between when a user requests an image with LMI, and when the shutter actually opens. Details can be found in the write up under the LMI link about the shutter delay. The bottom line is that:
|
UPDATE: The 2019A DCT Schedule has been released, and posted under the Science Schedule page. (2018Dec01)
Expand | ||
---|---|---|
| ||
An updated version of the NIHTS User Manual (v1.3 - 20181127) has been released and is available on the DCT confluence pages. Per the authors, "NIHTS User Manual v1.3 includes an update to the NIHTS calibrations procedure. We now advise observers to collect a full Long Arcs sequence at the beginning of the night, and Short Arcs (<2 min) at each target pointing to account for flexure in the instrument." |
Expand | ||
---|---|---|
| ||
The 2018 summer shutdown is over. A variety of things were done. Most will be transparent to most observers. I mention here things that might cause changes you might notice. We repositioned the secondary mirror, and changed the default piston of the primary mirror. As a result the nominal focus offsets for all instruments will have changed. The TOs will have up to date new values. All the LMI filters were removed, examined and if needed cleaned. The dome following algorithm has been modified so that the dome will now make longer, less frequent moves. The occultation warning is being updated to account for this. Work continues on NIHTS and a new User Manual was recently released. We are in the process of rebuilding the pointing and optics models. Please include any observations related to pointing and image quality that strike you in your night reports. Thank you. |
Expand | ||
---|---|---|
| ||
Tom has released an updated version of the DeVeny slit viewing camera GUI. Changes are documented and appear in the new release of the DeVeny Users Manual (v1.5), available below. |
Expand | ||
---|---|---|
| ||
The DeVeny Spectrograph Reference and Operations Guide has been updated for the new release of the slitviewing camera GUI application. Version v1.5 (10 July 2018) of the manual is now available on the Observing at DCT confluence page. |
Important Notes for all DCT Users and Visitor
DCTUsers Slack Channel for Discussion & Announcements
Proposing to Observe
Applying for Observing Time - 2019A DCT Call for Proposals
Observing Run Preparation
What to do before showing up for your run
First time using DCT, or a particular instrument?
Calendars:
...
As of 23 March 2021, these pages are no longer being maintained.
Please refer to the new LDTOI pages for current documentation.
Ephemeris Data Submission/Generation
Automated Function and Pattern Data Submission
Object Data and Finder Chart Generators
During Your Run
Target of Opportunity (ToO) Procedures
After Your Run
Data Retrieval
...
width | 50% |
---|
The Telescope
For an overview of the telescope and site, see
Information about the seeing and image quality:
- Levine, DeGroff 2016, SPIE, 9906, 990672 (delivered image quality)
- Bida et al. 2004, SPIE, 5489, 196 (site test data)
For an overview of the first generation Instruments, see
Instruments
DCT Instrumentation Current & Future
Expand | ||
---|---|---|
| ||
Operational.Web Page: Manual: DeVeny_Manual_v1.5_10July18.pdf Additional Information: DeVeny_Ops_Appendix.tar |
Expand | ||
---|---|---|
| ||
Operational - PI instrumentWeb Page: the instrument page at Gemini-N is mostly applicable and very informative Manual: Additional Information: DSSI is available part time at DCT. For information, contact E. Horch or G. van Belle. |
Expand | ||
---|---|---|
| ||
Commissioning now/limited science operationsWeb Page: EXPRES web page Manual: Additional Information: An overview of the instrument can be found in Jurgenson et al. 2016, Proc SPIE, 9908, 99086T |
Expand | ||
---|---|---|
| ||
On DCT through 30 April 2019Web Page: IGRINS wiki has a lot of information about IGRINS Manual: Additional Information: IGRINS will be available part of the year in 2016, 2017 and 2018. For information, contact L. Prato or G. Mace. |
...
title | LMI |
---|
Operational.
Web Page:
Manual: LMI User Manual
Additional Information: LMI Exposure time calculator, LMI Filter Information, LMI shutter delay
Expand | ||
---|---|---|
| ||
Operational, finishing commissioning.Web Page: Manual: NIHTS User Manual (v. 1.3 - 20181127) Additional Information: Overview of NIHTS (2018 Proc. SPIE 10702, 107023E) |
Expand | ||
---|---|---|
| ||
Coming soon.Web Page: Manual: Additional Information: |
Site Information
Where to stay when observing at DCT
General Information
Schedules for other Lowell telescopes
DCT Technical Publications & References
...