Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Excerpt Include | ||||||
---|---|---|---|---|---|---|
|
Livesearch | ||||
---|---|---|---|---|
|
Lowell Discovery Telescope
(formerly the Discovery Channel Telescope)
Observer Information Pages
(The information in the LDTOI space supersedes DCTIC: Observing at DCT)
Warning | ||
---|---|---|
| ||
| ||
For the duration of the COVID-19 outbreak, all observing at the LDT will be done remotely. See Continuing, limited in-person observing will be supported at LDT. For those observing remotely, see LDT Remote Observing Notes. |
Current Semester Observer and Telescope Operator Calendar
Float | ||
---|---|---|
| ||
Image: TJ. Ellsworth-Bowers (Lowell) |
Fernandez (Lowell)
|
The 4.3-m Lowell Discovery Telescope (LDT) is Lowell Observatory's flagship facility at a dark-sky site approximately 40 miles southeast of Flagstaff on the Coconino National Forest.Lowell Observatory operates the LDT in partnership with Boston University, University of Maryland, Northern Arizona University, University of Toledo, and Yale University. The telescope is classically scheduled by semester, with the current being 2021B.The . See the current call for observing proposals is linked in the sidebar at left for Lowell Observatory and Partner Institution members.
Facility Instruments:
LMI (Optical Imager)
DeVeny (Optical Spectrograph)
NIHTS (Near-infrared Spectrograph)
Visitor / PI Instruments:
EXPRES (Optical Spectrograph)
QWSSI (Optical Speckle Imager)
RIMAS (Near-infrared Spectrograph / Imager – Under Development, Coming 2022)
Instrumentation Main Page
List of LDT Scientific and Technical PublicationsThe facility was constructed as the Discovery Channel Telescope (DCT), and was renamed in 2019 in cooperation with Discovery Communications.
Background Color | |||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||
Updates (and Old Updates)UPDATE: The 2022A 2025B LDT schedule scheduled has been released. (2021Dec07(2025Jun24) UPDATE:Call for Proposals for 2025B released. (2025Apr09) UPDATE: NIHTS LMI is back in operation. (2021Nov15on-line as of Jan 30. (2025Jan31) UPDATE: The 2022A LDT Call for Proposals has been released. (2021Oct12DeVeny is back on-line as of Jan 14. (2025Jan14) UPDATE: The new VPN platform is now required for connection to the Lowell network. All remote observers MUST update their VPN settings: Watchguard SSLVPN Installation. (2021Sep06) UPDATE: The dome mounted flat lamp bulbs (typically used for LMI dome flats) were replaced today. One of the previous three was burned out. (2021Jun01) Check your VPN settings before your next remote observations (2024May14)
|